Lead-In Type P.V.D.

Work Process

Work Process

Characteristics

Workability

⦁N<30 Sandy layers, Stiff layers

Capable of installing upto 70m in depth 

Stability

⦁The center mass is located in the lower area to secure the stability of the machine

⦁Light weight self propelled machine (below 65Tons)

⦁Less chance of wire breaking or equipment falling over compared to the current wire pressurized hydraulic PVD

Work & Cost Efficiency

⦁Preboring works can be eliminated, resulting to shortening the working period and saving costs

⦁Friction wheels maximize the penetration strength

Head Office & Factory

93 Second Floor of Gaetae-gil, Iseo-myeon, Wanju-gun, Jeollabuk-do, Republic of Korea(Yuhyun Costruction)

Tel: +82-63-222-9340 | Fax: +82-63-222-9342

5, Singeumsandan 4-gil, Okgok-myeon, Gwangyang-si, Jeollanam-do, Republic of Korea(Mirae Tech)

Tel: +82-61-772-1075 | Fax: +82-61-772-1072 | E-mail: mr-t@hanmail.net

Copyright © 2020 Yuhyun Construction Co.,Ltd. & Mirae Tech Co.,Ltd. All Rights Reserved

floating-button-img