Vibrationless · Noiseless

G.C.P. / S.C.P.

Work Process

Characteristics

⦁The SCP method densifies the ground by compacting sand piles of ∅600mm ~ ∅800mm by using vibro-energy

⦁A sand pile is formed by repeating to penetration and pullout of the casing 

⦁Increased ground stability through sand piles 

⦁The sand material can be replaced with aggregates

Non-vibration, noise-free construction near downtown and residential facilities

Leaders Can Live Alone

Excellent construction quality in the driver's compartment with the ability to adjust the verticality and slope of the leader

⦁Adjustable count weight position, making it easy to balance before and after balance

Head Office & Factory

93 Second Floor of Gaetae-gil, Iseo-myeon, Wanju-gun, Jeollabuk-do, Republic of Korea(Yuhyun Costruction)

Tel: +82-63-222-9340 | Fax: +82-63-222-9342

5, Singeumsandan 4-gil, Okgok-myeon, Gwangyang-si, Jeollanam-do, Republic of Korea(Mirae Tech)

Tel: +82-61-772-1075 | Fax: +82-61-772-1072 | E-mail: mr-t@hanmail.net

Copyright © 2020 Yuhyun Construction Co.,Ltd. & Mirae Tech Co.,Ltd. All Rights Reserved

floating-button-img